The Problem How It Works Live Example Request Demo
Subsea AI Engineering

Your Project's
AI Engineer.
Available 24/7.

Project-specific AI trained on your work packs. When an offshore technician calls with a fault at 2am, SubsAI knows the project, reads the documentation, and guides the resolution — before anyone gets woken up.

2am
When offshore faults don't wait for office hours
30sec
Time to retrieve the right answer from your work pack
24/7
AI engineer availability, every project, every discipline
The Problem

The answer exists.
Nobody can find it at 2am.

Offshore platform North Sea
North Sea operations

An offshore technician calls in at 2am. The vessel is on standby. The client is furious. The on-call engineer who answers is not the right specialist.

The right answer is sitting in a document somewhere — the commissioning record, the fault history, the controls philosophy document. Nobody can find it under pressure at 2am on a moving vessel.

This happens on every project. The cost is real. The information already exists — in your work packs, your commissioning records, your fault history. The problem is access, not knowledge.

Downtime Is Expensive
Vessel standby costs per day can be costly on subsea projects. SubsAI will reduce downtime and costs.

Three steps.
One call resolved.

SubsAI ingests your project work packs and makes them instantly queryable in plain language. The AI does not make decisions — your engineer does. SubsAI delivers the right information, instantly.

01
We Ingest Your Work Pack

SubsAI ingests your complete project documentation — work packs, commissioning records, fault history, vendor manuals, approved procedures. Combined with built-in knowledge of industry standards (ISO, API, DNV, HSE, OGUK) and oil and gas engineering best practices, every project gets a genuine AI engineer — not a document search tool.

02
Engineer Asks a Question

Your engineer asks in plain language. SubsAI draws on project documentation AND its built-in knowledge of industry regulations, standards and best practices to give a complete, accurate answer — the way a senior specialist would.

03
Resolution or Briefed Escalation

Most faults resolve without waking anyone up. When escalation is needed, the human engineer receives a full briefing — fault description, relevant data, applicable standards, steps already taken. The decision always stays with your engineer.

Custom Built For Your Discipline

AI Engineer.

Each SubsAI agent is built custom for your discipline and your projects. It knows your work packs, your equipment, your fault history — and the regulations and standards that govern your operations.

Subsea Controls AVAILABLE NOW

SCM, TUTU, HPU, EPU, umbilicals, control system architecture, fault diagnosis, commissioning procedures. ISO 13628-6, NORSOK I-002, IEC 61508.

Subsea Hydraulics PHASE 2

Hydraulic power units, chemical injection, umbilical fluid systems, valve actuation, pressure testing, subsea hydraulic fault diagnosis.

Instrumentation PHASE 2

Pressure, temperature and flow sensors, subsea instrumentation systems, calibration, sensor fault diagnosis, measurement uncertainty.

Subsea Tree PHASE 3

Christmas tree retrieval, installation and intervention, tree running procedures, valve actuation, pressure testing, wellhead interface. ISO 13628-4, API 17D.

IWOCS PHASE 3

Intervention Workover Control Systems, IWOCS tooling and panel operations, offshore intervention campaign procedures, equipment compatibility.

Umbilical PHASE 3

Umbilical termination, flying lead installation and connection, electrical and hydraulic continuity testing, umbilical fault diagnosis. ISO 13628-5.

ROV PHASE 4

ROV tooling and panel operations, subsea intervention procedures, torque tool operations, hot stab procedures, ROV inspection and survey support.

Wireline PHASE 4

Slickline and electric line operations, well intervention procedures, lubricator and BOP operations, wireline tool strings and fishing procedures.

Commissioning PHASE 4

Commissioning procedures across multiple equipment types, punch list management, system handover documentation, pre-commissioning records.

Every agent is trained on your project documentation plus the regulations and standards that govern your operations — HSE, UKCS, OGUK, ISO 13628, API, DNV, NORSOK and more. The agent knows industry law and best practice as well as your specific project. That is what makes it an AI engineer, not a search tool.

Live Example

SubsAI in action.

Fault scenario: Low IR readings on subsea controls cables — 02:14 offshore

What just happened

An offshore technician detected low IR readings on the SCM to TUTU flying lead on Tree 4. Instead of calling the on-call engineer at 2am, they asked SubsAI.

SubsAI retrieved the commissioning baseline, compared it to the current reading, identified a precedent fault on the same project, and provided the isolation procedure — all from the project work pack.

  • Commissioning baseline retrieved in under 5 seconds
  • Previous fault history on Tree 2 identified immediately
  • Isolation procedure pulled from Section 7.4 of the Controls Operations Manual
  • No engineer woken up. Vessel standby avoided.
SubsAI // Project Specific
02:14
Offshore Technician
Getting low IR readings on the controls cable between SCM and TUTU on Tree 4. Reading is 2.8 megohms. Is that acceptable?
SubsAI Engineer
Commissioning baseline for the SCM to TUTU flying lead on Tree 4 was 48.2 megohms at first oil. Minimum operational limit for this cable type is 10 megohms per the project controls philosophy document. Your reading of 2.8 megohms is below the operational minimum.

Tree 2 had a similar reading in March 2023 — resolved by replacement of the wet mateable connector at the TUTU interface. Do you want the isolation procedure?
Offshore Technician
Yes — what's the isolation procedure?
SubsAI Engineer
Section 7.4, Controls Operations Manual: Confirm tree in safe state — all valves closed. Notify topsides before disconnection. ROV to disconnect flying lead at TUTU interface. Cap and bag both connector faces immediately. Log in controls fault register. Notify Subsea Controls Engineer before any reconnection attempt.

Do you need the connector torque specifications?
The Return

One avoided standby day. Years of SubsAI.

Subsea engineering operations
See It For Yourself

Request a Demo

No slides. No pitch deck.

We'll walk you through SubsAI using a real subsea controls fault scenario. You'll see the AI engineer answer specific technical questions from a project work pack — live, on the spot.

We'll describe the fault. You'll watch SubsAI retrieve the commissioning baseline, identify previous fault history, and provide the isolation procedure — in plain language, in seconds.

If it doesn't impress you, we'll walk away. No follow-up unless you ask for it.

Email: les@subsai.co.uk
Phone: Coming soon
Address: Unit 4 Huntingdon Road Industrial Estate, Dumfries, DG1 1NF
Serving: Aberdeen and the North Sea

Not selling. Just showing. No follow-up unless you ask for it.